|
|
![]() TM 9-3990-206-14&P
9-14. ROLLER REPAIR.
This task covers:
a. Disassembly
c. Assembly
b. Cleaning/Inspection
d. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Materials/Parts
Tool Kit, General Mechanic's: Automotive
Cloth, Lint-free (Item 4, Appendix E)
(Item 15, Appendix I)
Solvent, Drycleaning (Item 14, Appendix E)
Gloves, Chemical and Oil Protective
Pin, Spring (Item 21, Appendix H)
(Item 5, Appendix I)
Equipment Condition
Goggles, Industrial (Item 6, Appendix I)
Roller removed, (Para 8-4)
Gun, Air Blow (Item 7, Appendix I)
a.
Disassembly.
6
7
5
6
2
7
1
3
4
NOTE
Procedure shows left side roller; repair is the same for both rollers.
Right side roller has pin installed in opposite direction.
Note location of pin and collar prior to removal to ensure proper installation.
(1)
Remove and discard spring pin (1) from collar (2).
(2)
Remove collar (2), pin (3) and roller (4) from bracket (5).
NOTE
Perform Step (3) only if lockwire or safety pin is damaged.
(3)
Remove lockwire (6) from bracket (5) and safety pin (7).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |