TM 9-3990-206-14&P
10-7. WALL REPLACEMENT.
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
Bushing (2) (Item 4, Appendix H)
Tool Kit, General Mechanic's: Automotive
Pin, Cotter (4) (Item 17, Appendix H)
(Item 15, Appendix I)
Goggles, Industrial (Item 6, Appendix I)
Jackstand (8) (Item 9, Appendix I)
Personnel Required
Lifting Device, Minimum Capacity
Two
8,000 lbs (3,629 kg)
Wrench, Combination 1-1/8 in.
Equipment Condition
(Item 20, Appendix I)
Stowage boxes removed,
(Front wall only), (Para 9-16)
Materials/Parts
Tiedown rings removed, (Para 9-19)
Grease, GAA (Item 6, Appendix E)
(Tiedown rings on wall only)
Rope, 3/4 in. thick, 20 ft. (2) (Item 11, Appendix E)
Front pin assemblies and brackets removed,
Sealing Compound (Item 12, Appendix E)
Bushing (2) (Item 1, Appendix H)
Rear pin assemblies and brackets removed,
Bushing (2) (Item 2, Appendix H)
Bushing (2) (Item 3, Appendix H)
Mud flaps removed, (Para 9-22)
|