Click here to make tpub.com your Home Page

Page Title: Removal. (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
(9)
Loosen nut (9) on screw (10).
(10)
Remove screw (10), nut (9) and washer
10
9
11
12
14
15
(11) from retainer block (12).
(11)
Remove retainer block (12) from
bracket (13).
(12)
Remove hinge pin (14) from hinge (15).
(13)
Repeat Steps (9) through (12) for other side
of wall.
NOTE
Steps (14), (15) and (16) are
for front wall only. If
removing rear wall, go on to
Step (17).
13
Right and left pins are
removed the same way.
Left side shown.
17
18
(14)
Remove two safety pins (16) from pin (17).
(15)
Remove pin (17) from hinge (18).
(16)
Repeat Steps (14) and (15) for other side of
wall.
16
Front wall weighs 1,500 lbs
(681 kg). Rear wall weighs 1,200
lbs (545 kg). Attach suitable
lifting device prior to removing
wall to prevent injury or death to
personnel.
(17)
Reposition lifting device and attach to four
LIFTING
DEVICE
corners of wall (2).
Ensure guide rope is installed on
2
19
opposite corners of wall as shown.
Failure to comply can result in
injury or death to personnel.
(18)
Install guide rope on two corners of
LADEN LIFT
wall (2).
EMPTY LIFT
EMPTY LIFT
F POCKET
F POCKET
F POCKET
GUIDE
(19)
With the aid of an assistant and using lifting
ROPE
device and guide rope, remove wall (2)
from deck (19) and position wall on four
jackstands.
10-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business