DRAFT
TB 9-2320-364-13&P-1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Materials/Parts
Maintenance Level
Field Level Maintenance
Equipment Condition
Preformed Packings (2), (Item 25, Figure 6,
Tools and Special Tools
Personnel Required
MOS 52C, Utilities equipment repairer (2)
Wheel chocks (TM 9-2320-364-10)
References
Wooden blocks (TM 9-2320-364-34)
TM 9-2320-364-10
TM 9-2320-364-20
TM 9-2320-364-34
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -