DRAFT
TB 9-2320-364-13&P-1
AC SYSTEM REFRIGERANT (R-134a) MAINTENANCE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Recovery
Evacuation
Charging
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Materials/Parts
Maintenance Level
Field Level Maintenance
Equipment Condition
Wheels chocked (TM 9-2320-364-10).
Preformed Packing (Item 10, Figure 3,
Tools and Special Tools
Personnel Required
MOS 52C, Utilities equipment repairer
References
TM 9-2320-364-10
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -