DRAFT
TB 9-2320-364-13&P-1
AC WIRING HARNESS REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Tools and Special Tools
Field Level Maintenance
Equipment Condition
Materials/Parts
Batteries disconnected (TM 9-2320-364-20).
Heater compartment access panel removed
(TM 9-2320-364-20).
Electronic control box (ECB) covers removed
(TM 9-2320-364-20).
Electronic control box (ECB) right side panel
removed (TM 9-2320-364-20).
Personnel Required
Right side noise panel removed
One
(TM 9-2320-364-20).
Left side noise panel and rubber flap removed
References
TM 9-2320-364-20
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -