• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONDENSOR INSTALLATION. - Continued
HEATER/EVAPORATOR INSTALLATION. - Continued

Air Conditioning System Nsn 4120-01-526-9158 P/N 3528349 For Truck, Tractor M1074/M1075 Palletized Load System Page Navigation
  446    447    448    449    450  451  452    453    454    455    456  
img
TB 9-2320-364-13&P-1
4. HEATER/EVAPORATOR INSTALLATION.
This task covers:
a.  Heater/Evaporator Installation.
INITIAL SETUP
Models
Supplies (Continued)
All
(5) Bezel
(2) Air Diffuser Ball
Test Equipment
(3) Hose Clamp
(5) Nutsert
None
Circuit Breaker 20 amp
Special Tools
Wire Assembly 10 Gage
Wire Assembly 12 Gage
Nutsert Tool
Wire Assembly 12 Gage
Torque Wrench
Light Source
Supplies
Clip
Bulb
Heater/Evaporator
Light Wiring Harness
Gasket - 1/2 in. x 1/2 in.
Heat Shrink
Straight Fitting
(3) Cable Tie
Straight Fitting
(16) Cable Tie
Insulation
(3) Cable Tie
1300 3M Adhesive
(5) Grommet
Personnel Required
PVC Foam Tape
Three
(6) Lockwasher - 1/4 in.
(6) Screw - 1/4-20 x 3/4 in.
References
Fresh Air Box Opening Cover
None
PVC Foam Tape
(14) Screw - 10-32 x 1/2 in.
Equipment Condition
(12) Lockscrew - 1/4-20 x 1/2 in.
Heater Compartment Center Cover
None
Heater Cable
Special Environmental Conditions
Defrost Cable
Air Conditioner Cable
None
(4) Speed Nut - 3/16 in.
General Safety Instructions
Fan Label
Air Conditioner Temperature Label
None
Rotary Switch Kit
Optic Ribbon
0055-37


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.