• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEATER/EVAPORATOR INSTALLATION. - Continued
HEATER/EVAPORATOR INSTALLATION. - Continued

Air Conditioning System Nsn 4120-01-526-9158 P/N 3528349 For Truck, Tractor M1074/M1075 Palletized Load System Page Navigation
  459    460    461    462    463  464  465    466    467    468    469  
img
TB 9-2320-364-13&P-1
73. Remove two caps (107) from two fittings (3 and 6).
74. Install two heater hoses (108) on coolant tubes (30)
and tighten two hose clamps (109).
75. Install heat cable (55) on shaft (110) of heater
control valve (111).
76. Place heat cable (55) in retainer (112) and tighten
screw (113).
77. Install preformed packing (114) and hose 2524 (115)
on fitting (3). Torque hose 2524 (115) to 11-13 ft-lbs.
(15-18 Nm).
78. Install preformed packing (116) and hose 2522 (117)
on fitting (6). Torque hose 2522 (117) to 18-22 ft-lbs.
(24-30 Nm).
79. Connect connector (106).
0055-50


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.