• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEATER/EVAPORATOR INSTALLATION. - Continued
HEATER/EVAPORATOR INSTALLATION. - Continued

Air Conditioning System Nsn 4120-01-526-9158 P/N 3528349 For Truck, Tractor M1074/M1075 Palletized Load System Page Navigation
  455    456    457    458    459  460  461    462    463    464    465  
img
TB 9-2320-364-13&P-1
CAUTION
Wire 1082 and wire 1052 being cut in
Steps (50) and (51) are from the cab
wiring harness. Do not cut wire 1082
coming from the circuit breaker installed
in Step (47). Failure to comply may result
in damage to equipment.
50. Cut wire 1082 (79) below terminal (80). Discard
terminal (80).
51. Cut wire 1052 (81) below lamp socket (82). Discard
lamp socket (82).
52. Install heat shrink (83) on end of cut
wire 1082 (79).
53. Install end of lighting wire harness (84)
on end of cut wire 1052 (81) with butt
splice (85).
54. Install ring terminal (86) of lighting wire
harness (84) on heater/evaporator (4)
with screw (87), lockwasher (88) and
washer (89).
55. Install bulb (90) in lighting wire
harness (84).
56. Install lighting wire harness (84) and
bulb (90) in light source (91).
57. Install clip (92) on panel (93).
58. Install light source (91) on clip (92).
0055-46


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.