• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEATER/EVAPORATOR INSTALLATION. - Continued
HEATER/EVAPORATOR INSTALLATION. - Continued

Air Conditioning System Nsn 4120-01-526-9158 P/N 3528349 For Truck, Tractor M1074/M1075 Palletized Load System Page Navigation
  452    453    454    455    456  457  458    459    460    461    462  
img
TB 9-2320-364-13&P-1
26. Install two upper plenums (34) on lower plenum (21)
with six lockscrews (35).
27. Install two upper plenums (34) on heater/evaporator (4)
with two screws (36), lockwashers (37) and washers (38).
28. Install heater/evaporator (4) in cab (16) with six
screws (39) and lockwashers (40).
29. Install 1/2 x 1/2 in. gasket (41) on edge of two
upper plenums (34).
0055-43


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.