Figure 59. Steering Link, Torque Rod, Glad Hands, and Electrical Connector re-installed.
Figure 61. Underbody Attachment Bracket, Left Side.

Crew Protection Kit For M1074/M1075 Palletized Load System M1074P1 (Nsn 2320-01-523-1047) M1075P1 (Nsn 2320-01-523-1049) Page Navigation
  274    275    276    277    278  279  280    281    282    283    284  
img
. .
II113300-1-103
Rev. A
Page 79
f)
Remove the four bolts shown in Figure 60.
g) Remove a section of sheet metal from underneath the front wheel well, as shown in
Figure 60 and Figure 61. This is needed to provide clearance for the Left Mineblast
Bracket (P/N 113364-1-103).
h) Install the Left Mineblast Bracket to the support rail using the hardware shown in
Figure 61.
Remove Bolts
Remove Sheet
Metal Here
Figure 60. Left Mineblast Bracket location.
0037 00-91