TM 9-2320-364-34-2
9-38
Materials/Parts
Grease (Item 22, Appendix B)
Wire (Item 79, Appendix B)
Ring, Retaining (Item 502, Appendix E)
Ring, Retaining (Item 503, Appendix E)
Sealing Kit (Item 624, Appendix E)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
(Perform first five equipment conditions only if
removing Axle No. 1 and Axle No. 5 right side
constant velocity joint and Axle No. 2 left side
constant velocity joint)
Start engine, (TM 9-2320-364-10)
Build up air pressure to 125 psi,
(TM 9-2320-364-10)
Shift transfer case to low, (TM 9-2320-364-10)
Switch CTIS switch to EMERGENCY,
(TM 9-2320-364-10)
Drive truck forward or backwards,
(TM 9-2320-364-10)
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Pivot and spindle assembly removed, (Para 9-9)
Locking cylinder removed,
Axle No. 1 or Axle No. 5 if removing right side
constant velocity joint, (Para 9-15)
Axle No. 2 if removing left side constant
velocity joint, (Para 9-16)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Extractor, Inertial (Item 56, Appendix F)
Extractor, Inertial (Item 57, Appendix F)
Pliers, Retaining Ring (Item 158, Appendix F)
Press, Arbor, Hand Operated
(Item 162, Appendix F)
Puller Kit, Universal, Slide Hammer
(Item 175, Appendix F)
Adapter, Slide Hammer (Appendix C)
9-8. AXLE NO. 1, 2 AND 5 CONSTANT VELOCITY JOINT REPAIR.
|