| |
TM 9-2320-364-34-3
14-12
Materials/Parts
Sealing Compound (Item 53, Appendix B)
Tag, Identification (Item 72, Appendix B)
Bolt Kit, Air Spring (Item 18, Appendix E)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Air system drained, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Wrench, Torque (0 to 175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
14-4. AXLE NO. 3 AIR BAGS REPLACEMENT.
a.
Removal.
Air bags may still be pressurized
even though air pressure gauge
reads 0 psi. Remove air line
slowly to allow air to escape.
Failure to comply may result in
air line blowing off causing
serious injury to personnel.
NOTE
Right and left air bags on
Axle No. 3 are removed in
the same way. The left side
air bag is shown.
Right side air bag air line is
2793. Left side air bag air
line is 2794.
(1)
Remove air line 2794 (1) from elbow (2).
(2)
Remove elbow (2), fitting (3) and pipe
nipple (4).
|