16-3. BOOM ASSEMBLY REPAIR (CONT).
(17)
Apply hydraulic oil to five preformed
packings (7).
(18)
Install five preformed packings (7) on
fittings (6) and connect hoses (5).
NOTE
Route wire harness and install
cable ties as necessary.
(19)
Route wire harness (3) and connect
connector (1) at top rear of overload
shutdown box (2).
f.
Follow-On Maintenance:
Install telescope cylinder, (Para 16-10).
Install hook block, (TM 9-2320-364-20).
Grease all pivot points, (TM 9-2320-364-20).
Install muffler, (TM 9-2320-364-20).
Return LHS to transit position, (TM 9-2320-364-10).
Check hydraulic reservoir oil level, (TM 9-2320-364-10).
Check crane operation, (TM 9-2320-364-10).
Adjust boom cable and chain, (Para 16-4).
Load test crane, (Para 16-32).
Stow crane, (TM 9-2320-364-10).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|