Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: f. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-56      16-3.  BOOM ASSEMBLY REPAIR (CONT). (17) Apply hydraulic oil to five preformed packings (7). (18) Install five preformed packings (7) on fittings (6) and connect hoses (5). NOTE Route wire harness and install cable ties as necessary. (19) Route wire harness (3) and connect connector (1) at top rear of overload shutdown box (2). f. Follow-On  Maintenance: Install telescope cylinder, (Para 16-10). Install hook block, (TM 9-2320-364-20). Grease all pivot points, (TM 9-2320-364-20). Install muffler, (TM 9-2320-364-20). Return LHS to transit position, (TM 9-2320-364-10). Check hydraulic reservoir oil level, (TM 9-2320-364-10). Check crane operation, (TM 9-2320-364-10). Adjust boom cable and chain, (Para 16-4). Load test crane, (Para 16-32). Stow crane, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business