Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Rubber bumpers
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3      18-209 (35) Remove lifting frame (328) from PLS truck in flatrack mode (TM 9-2320-364-10). (36) Install lifting frame (328) on PLS truck in container mode (TM 9-2320-364-10). (37) Measure gap between bail bar (352) and hook (353) as shown. NOTE Both rubber bumpers are removed the same way. Right side shown. Shims and locknuts can be found in boxes D and F, pack no. 16 and 70 of CHU kit crate. Shims are 0.104 in. (2.7 mm) thick. Add shims to decrease clearance. Remove shims to increase clearance. If gap is not 0.38 in. 0.25 in. (9.65 mm 6.35 mm), perform Steps (38) through (46). If gap is 0.38 in. 0.25 in. (9.65 mm 6.35 mm), perform Step (47). (38) Start engine (TM 9-2320-364-10). (39) Using LHS, raise lifting frame (328) approximately 12 in. (30 cm) off of rubber bumpers (354). (40) Shut OFF engine. (41) Remove two locknuts (355) and rubber bumpers (354) from bumper weldment (356). Discard locknuts. (42) Install two rubber bumpers (354), shim(s) (357), as required, and two locknuts (355) on bumper weldment (356). (43) Repeat Steps (41) and (42) for left side. 353 354 328 352 0.38 IN. 0.25 IN. (9.65 MM 6.35 MM) 357 356 355

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business