| |
TM 9-2320-364-34-3
18-210
18-13. CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
(44)
Start engine (TM 9-2320-364-10).
(45)
Position lifting frame on cone weldment
(TM 9-2320-364-10).
(46)
Shut OFF engine (TM 9-2320-364-10).
NOTE
Both deck weldments are
installed the same way. Right
side shown.
Lockwashers can be found in
box F, pack no. 70 of CHU
kit crate.
(47)
Position deck weldment (55) on front
support assembly (51) and install two
screws (52), lockwashers (53) and washer
(54).
(48)
Tighten two screws (56) on front support
assembly (51).
(49)
Repeat Steps (47) and (48) for left side.
NOTE
Ensure slider arm is
deployed.
Both flip lock brackets are
adjusted the same way. Right
side shown.
(50)
Remove quick release pin (178) and pin
(179) from short strut (168) and long strut
(180).
(51)
With the aid of an assistant and using
handle of arm assembly (158), rotate arm
assembly out and separate short strut (168)
from long strut (180).
158
168
178
179
180
55
53
51
52
56
54
|