Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4      20-277 NOTE Other screw and washer installed with front lift bracket. (13) Install washer (12) and screw (11).  Tighten screw 137 to 147 lb-ft (186 to 199 N.m). (14) Install washer (9), lockwasher (8) and screw (7).  Tighten screw 71 to 75 lb-ft (96 to 102 N.m). (15) Install key (5) on vibration damper shaft (6). (16) Position vibration damper (4) on vibration damper shaft (6). (17) Install washer (3), lockwasher (2) and screw (1).  Tighten screw to 25 lb-ft (34 N.m). b. Follow-On  Maintenance: Install engine oil cooler, (Para 20-83). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business