|
|
![]() TM 9-2330-385-14
This task covers:
a. Resistor/Circuit Board Test
c. Circuit Board Replacement
b. Resistor Replacement
d. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Equipment Condition
Tool Kit, General Mechanic's
Rear electrical box removed, (Para 4-26)
(Item 49, Appendix J)
Gun, Heat (Item 16, Appendix J)
Multimeter, Digital (Item 28, Appendix J)
Pencil, Soldering, Electric (Item 30, Appendix J)
Materials/Parts
Adhesive Sealant (Item 4, Appendix E)
Cable Ties (Item 8, Appendix E)
Heat Shrink (Item 14, Appendix E)
Sealing Compound (Item 19, Appendix E)
Tags, Identification (Item 23, Appendix E)
a.
Resistor/Circuit Board Test.
NOTE
Box cover will be connected to
the box by wires. Set cover to
one side to gain access to the
box.
(1)
Loosen four captive screws (1) and remove
box cover (2) from box (3).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |