Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
Section II. OPERATION UNDER USUAL CONDITIONS
7-8. ASSEMBLY AND PREPARATION FOR USE.
Unpacking. Refer to Para 9-4, Unpacking and Packing, for unpacking instructions.
a.
b.  Assembly and Installation. Refer to Chapter 9, Loose Parts Installation, for assembly and installation
instructions, including removal of rollers from stowage points. Refer to Sideboard Kit and Cargo Tarp
Installation and Removal Instructions, Paras 7-11 and 7-12 if sideboards, straps and cargo tarp must be installed.
7-9. UNLOCK AND LOCK TWIST LOCKS.
a.
Unlock Twist Locks.
2
1
NOTE
Sliding handle may be used from Basic Issue Items (BII) to rotate twist lock.
Right and left pin assemblies are operated the same way. Front and rear pin assemblies are
operated the same way. Left front shown.
(1)
Rotate locking handle (1) of twist lock (2) approximately 1/8 turn in either direction.
(2)
Rotate twist lock (2) backwards from stowage position.
b.
Lock Twist Locks.
(1)
Rotate twist lock (2) into stowage position.
(2)
Rotate locking handle (1) of twist lock approximately 1/8 turn in either direction to lock twist lock in
stowage position.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business