|
|
TM 9-3990-206-14&P
7-11. SIDEBOARD KIT.
a.
Installation.
2
5
1
3
4
1
Sideboards and straps secure load to flatrack. Install sideboards and straps to flatrack
before trying to move load or damage to equipment or load may result.
NOTE
Refer to illustration for correct panel location.
(1)
Line up stakes (1) of sideboard sections (2) with sideboard pockets (3) on flatrack. Push sideboard
sections down until seated in pockets.
(2)
Anchor sideboard sections (2) to sideboard pockets (3) with retaining clips (4).
(3)
Install tiedown straps to cargo.
b.
Removal.
(1)
Remove tiedown straps from cargo and stow in stowage box (5).
(2)
Remove retaining clips (4) from sideboard pockets (3) and stakes (1).
(3)
Lift sideboard sections (2) out of sideboard pockets (3).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |