DRAFT
TB 9-2320-364-13&P-1
AC LOW PRESSURE SWITCH REPLACEMENT - Continued
INSTALLATION
PLSAC049
NOTE
Lightly lubricate preformed packing with PAG oil prior to installation.
Ensure preformed packing is in place in low pressure switch prior to installation.
1. Install preformed packing (6) and low pressure switch (5) on hose 2522 (7). Torque low pressure
switch (5) to 7.5-10 ft-lbs. (10-14 Nm).
NOTE
Install cable ties as required.
2. Connect connector (3) to connector (4).
3. Connect connector (1) to connector (2).
FOLLOW-ON MAINTENANCE
1. Install electronic control box cover (ECB) right side panel (TM 9-2320-364-20).
2. Connect batteries (TM 9-2320-364-20).
END OF WORK PACKAGE
0040-3/(0040-4 blank)