• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AC OPTIC RIBBON REPLACEMENT - Continued
AC OPTIC RIBBON REPLACEMENT - Continued

Air Conditioning System Nsn 4120-01-526-9158 P/N 3528349 For Truck, Tractor M1074/M1075 Palletized Load System Page Navigation
  336    337    338    339    340  341  342    343    344    345    346  
img
DRAFT
TB 9-2320-364-13&P-1
AC OPTIC RIBBON REPLACEMENT - Continued
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PLSAC111
NOTE
Install temperature control switch as noted prior to removal.
4. Install temperature control switch (8) on center cover (5) with nut (9).
5. Install knob (7) on temperature control switch (8) and tighten two screws (6).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PLSAC110
NOTE
Install fan control switch as noted prior to removal.
6. Install fan control switch (3) on center cover (5) with nut (4).
7. Install knob (2) on fan control switch (3) and tighten two screws (1).
0041-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.