HOSE AND WIRE HARNESS ROUTING. - Continued
CONDENSOR INSTALLATION.

Air Conditioning System Nsn 4120-01-526-9158 P/N 3528349 For Truck, Tractor M1074/M1075 Palletized Load System Page Navigation
  436    437    438    439    440  441  442    443    444    445    446  
img
TB 9-2320-364-13&P-1
24. Route ground branch of wire harness (7) to starter relay (34).
NOTE
Remove sealant from screw before installing wire on starter relay.
Reapply sealant after installing screw and wire on starter relay.
25. Install wire (35) of wire harness (7) on starter relay (34) with existing screw (36).
26. Route hose 2521 (18), hose 2522 (3) and wire harness (7) under transmission sampling valve hose (37).
NOTE
Hose 2521, hose 2522 and wire harness will not be attached to condensor until the condensor is
installed.
27. Position hose 2521 (18), hose 2522 (3) and wire harness (7) on top of battery box cover (38).