|
|
![]() TM 9-3990-206-14&P
Section II. OPERATION UNDER USUAL CONDITIONS
a.
b. Assembly and Installation. Refer to Chapter 4, Loose Parts Installation, for assembly and installation
instructions, including removal of rollers from stowage points. Refer to Sideboard Kit, Para 2-9 if sideboards and
straps must be installed.
c.
Lock and Unlock Front ISO Locks.
Ensure all ISO container locks are unlocked before trying to load container on flatrack.
Damage to both container and ISO locks could occur if locks are not correct.
Ensure sideboards have been removed from flatrack before trying to load ISO container
or damage to equipment may result.
NOTE
Steps (1) and (2) must be performed before loading ISO container.
(1)
Lift up on handle (1) and rotate to the left to lift lock body (2).
(2)
Twist handle (1) further to allow top (3) of lock to be in position to engage ISO container.
(3)
After installing ISO container, twist handle (1) to lock ISO container and flatrack together.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |