|
|
![]() TM 9-3990-206-14&P
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Materials/Parts
Tool Kit, General Mechanic's: Automotive
Waterproofing, Wood (Item 16, Appendix E)
(Item 15, Appendix I)
Floor Board (a/r) (Appendix G)
Drill, Electric, Portable (Item 3, Appendix I)
Screw, Flooring (a/r) (Item 26, Appendix H)
Drill Set, Twist (Item 4, Appendix I)
Personnel Required
Gloves, Chemical and Oil Protective
Two
(Item 5, Appendix I)
Goggles, Industrial (Item 6, Appendix I)
Equipment Condition
Socket, T-30 (Item 13, Appendix I)
Front and rear wall raised, (Para 7-10)
Main rail cap removed, (Para 9-23)
a.
Removal.
1
2
4
3
(1)
Remove screws (1) from floor board (2) and crossmember (3). Discard screws.
Ensure all personnel wear protective gloves when handling rear wall floor board to protect
hands from wood splinters. Failure to comply may result in injury to personnel.
(2)
With the aid of an assistant, remove floor board (2) from flatrack (4).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |