DRAFT
TB 9-2320-364-13&P-1
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Materials/Parts
Field Level Maintenance
Equipment Condition
Batteries disconnected (TM 9-2320-364-20).
Preformed Packing (Item 10, Figure 3,
Preformed Packing (Item 2, Figure 3,
Tools and Special Tools
Shop Equipment, Common No. 1 (Item 5,
Personnel Required
Shop Equipment, Common No. 2 (Item 6,
MOS 52C, Utilities equipment repairer (2)
References
Wheel chocks (TM 9-2320-364-10)
TM 9-2320-364-10
Wooden blocks (TM 9-2320-364-34)
TM 9-2320-364-20
TM 9-2320-364-34
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -