• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Table 1. Operator Preventive Maintenance Checks and Services - Continued

Parts Manual For Pallet, Adapter, Bridge M15 Page Navigation
  255    256    257    258    259  260  261    262    263    264    265  
img
.
TM 5-3990-263-13&P
0035
Table 1.
Operator Preventive Maintenance Checks and Services - Continued
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
4
3
JACO
BS
ENGIN
EBRA
KE
6
CAUT
ION
XHA
OE   U
ILER Y
TRA  PILG
RSUPND
N
ANIOTFORDPARK
ILA
M
US
HTO
2
6
5
7
1
1
ANALOG CBT
CONTROL PANEL
2
DIGITAL CBT
CONTROL PANEL
Figure 1.
Load Handling System.
Set PTO ENGAGE switch (Figure 1, Item 3) in ON.
Ensure indicator light (Figure 1, Item 4) comes on.
Move joystick (Figure 1, Item 2) to UNLOAD to raise LHS
about one to two feet (0.305 to 0.610 m). LHS
ENGAGED indicator (Figure 1, Item 5) light will light
green, and NO TRANSIT WHEN LIT indicator (Figure 1,
Item 6) light will light red.
LHS OVERLOAD indicator (Figure 1, Item 7) may light
yellow if system is overloaded.
Move joystick (Figure 1, Item 2) to LOAD position. NO
TRANSIT WHEN LIT indicator (Figure 1, Item 5) light will
go out.
0035-2
03/15/2011Rel(1.8)root(pmcswp)wpno(I04003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.