Figure 10. Engage IRB Foldlock Latches
Figure 12. Brake and Transmission Controls.

Parts Manual For Pallet, Adapter, Bridge M15 Page Navigation
  113    114    115    116    117  118  119    120    121    122    123  
img
.
TM 5-3990-263-13&P
0012
OPERATION - Continued
26.
Set HIGH IDLE switch (Figure 11, Item 20) to ON position.
20
31
32
23
21
24
22
s
he )
nc m
6i 5c
(1
Figure 11. Remote Control Unit Controls.
27.
Position MAIN FRAME switch (Figure 11, Item 23) to LOAD and release when cable slack has been removed.
WARNING
Ensure bridge bay is clear of boat crew personnel and obstructions prior to winching in bridge
bay. Ensure crewman is safely off bridge bay prior to lifting. Failure to comply may result in
serious injury or death to personnel.
NOTE
During bridge bay recovery in fast moving water or strong crosswinds, it may be necessary
to position a boat with the push knees against the downstream bow to keep bridge bay aligned
with Transporter.
28.
Position WINCH switch (Figure 11, Item 24) to IN.
29.
Steadily winch in cable as bridge bay folds and automatically latches.