TM 5-3990-263-13&P
OPERATOR MAINTENANCE
NORMAL TRANSFER OF BRIDGE ADAPTER PALLET (BAP) FROM VEHICLE TO TRAILER
INITIAL SETUP:
Personnel Required
References (cont.)
(2)
References
GENERAL
NOTE
Perform all operator's before-preventive maintenance checks (WP 0035) prior to operating
the CBT and/or BAP. Ensure all checks and adjustments have been completed by field level
maintenance.
1.
This section contains instructions for safely operating the CBT and BAP under usual conditions.
2.
Instructions for safely operating the vehicle in unusual conditions are covered in WP 0017 through WP 0022
of this manual.
OPERATION
WARNING
Prior to and during any load or unload cycle, all personnel should stay clear of LHS and
BAP. Failure to comply may result in serious injury or death to personnel.
Trailer wheels must be chocked during transfer operations. Failure to comply may result
in serious injury or death to personnel.
CAUTION
To avoid damage to equipment during transfer operations, ensure trailer drawbar
extension is retracted and on the ground, centered forward of the trailer. Ensure drawbar
and drawbar extension are properly positioned. Refer to TM 9-2320-385-10. Failure to
comply may result in damage to equipment.
Ensure air lines and cables are properly stowed, to prevent damage to equipment. Refer
to TM 9-2320-385-10. Failure to comply may result in damage to equipment.
0013-1
03/15/2011Rel(1.8)root(opusualwp)wpno(O01064)