TM 5-3990-263-13&P
0035
Table 1.
Operator Preventive Maintenance Checks and Services - Continued
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
2
2
1
1
Figure 9.
Rear Guide Assemblies.
12
Before
Transload
Inspect transload rollers (Figure 10, Item 1) and
Transload rollers are
Rollers
extension cylinders (Figure 10, Item 2) for damage and damaged or will not move
freedom of movement.
freely.
2
2
1
1
Figure 10.
Transload Rollers.
13
During
BAP Air Lines,
Check air lines, hoses, and fittings for leaks, dents,
Hoses, and
cracks, and kinks.
Fittings
14
During
BAP Winch
Check winch cable (Figure 11, Item 1) for broken wires Winch cable has more
Assembly
and kinks. If in doubt, notify field level maintenance.
than three broken wires
per 3 in (7.62 cm) section
on same strand Maximum
number of broken wires
shall not occur in any two
consecutive 3 in (7.62 cm)
03/15/2011Rel(1.8)root(pmcswp)wpno(I04003)