TM 5-3990-263-13&P
FIELD MAINTENANCE
FIELD LEVEL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INITIAL SETUP:
References (cont.)
Materials/Parts
References
Equipment Condition
Vehicle PMCS performed (TM 9-2320-425-10 or
Table 1. FIELD LEVEL PMCS
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
NOTE
Operator PMCS must be performed in con-
junction with Field Level PMCS.
1
Semi-
Catwalk
Inspect catwalk sections (Figure 1, Item 1) for damaged
Annual
or missing hardware.
03/15/2011Rel(1.8)root(pmcswp)wpno(I04004)