TM 5-3990-263-13&P
0055
INSTALLATION - Continued
NOTE
To install check valve correctly, use the marks made on check valve, straight adapter, and
tube nut during removal.
7.
Install tube nut (Figure 6, Item 49) on straight adapter (Figure 6, Item 48). Install check valve (Figure 6, Item
47) on straight adapter (Figure 6, Item 48). Install straight adapter (Figure 6, Item 46) on check valve (Figure
6, Item 47). Install tube nut (Figure 6, Item 44) and tube (Figure 6, Item 45) on straight adapter (Figure 6, Item
46).
8.
Install tube nut (Figure 6, Item 54) and tube (Figure 6, Item 55) on elbow (Figure 6, Item 56). Install tube nut
(Figure 6, Item 37) on other end of tube (Figure 6, Item 55) on straight adapter (Figure 6, Item 38).
9.
Install tube nut (Figure 6, Item 59) and tube (Figure 6, Item 60) on elbow (Figure 6, Item 61).
10.
Install tee (Figure 7, Item 23) and preformed packing (Figure 7, Item 27) on bottom of valve block (Figure 7,
Item 28). Install elbow (Figure 7, Item 35) and O-ring (Figure 7, Item 36) on top of valve block (Figure 7, Item
28).
0055-9
03/15/2011Rel(1.8)root(maintwp)wpno(M04049)