TM 5-3990-263-13&P
OPERATOR MAINTENANCE
MANUALLY UNLOADING BRIDGE ADAPTER PALLET (BAP) TO THE GROUND
INITIAL SETUP:
Personnel Required
References
(2)
PERFORM PROCEDURE
NOTE
The following manual mode operations using the cab control box are to be performed only
1.
Secure winch frame to the BAP and ensure two winch frame locking levers (Figure 1, Item 1) are in the up
position.
1
2
Figure 1. Secure Winch Frame.
2.
If locking levers (Figure 1, Item 1) are not up:
a.
Remove lockpin (Figure 1, Item 2) from each locking lever (Figure 1, Item 1).
b.
Swing locking lever (Figure 1, Item 1) to the up position.
c.
Insert lockpin (Figure 1, Item 2) into locking lever (Figure 1, Item 1).
3.
If the BAP is loaded, inspect load and ensure it is secure.
4.
Connect two hydraulic hoses (Figure 2, Item 3) to the stowed location connections (Figure 2, Item 4).
03/15/2011Rel(1.8)root(opunuwp)wpno(O01051)